PROJECT PLANNING INFORMATION
3 Project Planning Information
3.1 Work steps from system selection to start-up
Application changes
If the information regarding your application submitted with your purchase order has
changed, or if a device is to be used for an application other than the one that was
originally
intended, please contact your local sales representative or our project planning
department to determine whether the device(s) can be used under the new conditions, and
whether readjustment or reparametrization is necessary.
The following steps are generally carried out before the measuring system is started up:
Project planning
See planning checklist below
Initial onsite installation
The following preparations, usually carried out by the customer, are described in
“Initial
onsite installation”, page 20
.
Flange assembly, see
“Installing the flanges with tube”, page 21.
Preparations for installing the purge air unit, see “Installation preparation for the purge
air unit”, page 24
.
Laying the signal and power supply cables to the measuring point, see “Duct insulation”,
page 24.
Preparations for installing the EvU, see “Installation preparation for the evaluation
unit”, page 25
.
If necessary, preparing the signal cables for the interfaces to the peripheral equipment,
see “Preparations for electrical installation”, page 25.
Device installation
To allow speedy start-up, the following components are normally installed ready for
operation before the start-up date; see also “Installation”, page 30.
Purge air unit
Evaluation unit
Start-up
The actual start-up procedure is carried out by trained personnel or SICK Customer Ser-
vice. This work is described on
page 69. The main activities are adjustment tasks on the
GM35 system related to the application.