8009441/YN36/V3-0/2015-08| SICKOPERATING INSTRUCTIONS|GM35
Subject to change without notice
INSTALLATION
4.2.3 Terminal box (option)
Install the terminal box in the vicinity of the measuring point.
Secure the enclosure on the two mounting holes ( 5 mm).
The cable length available from the terminal box to the SR-unit is 4 m.Take the empty
conduits laid for the prefabricated cables during onsite preinstallation into account.
Fig. 15: Fitting the terminal box

Mounting holes

Table of Contents

Other manuals for SICK GM35

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SICK GM35 and is the answer not in the manual?

SICK GM35 Specifications

General IconGeneral
BrandSICK
ModelGM35
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals