PROJECT PLANNING INFORMATION
3.3 Initial onsite installation
The following work can be carried out by the customer's technicians. Requirement: The
project planning checklist has been processed beforehand.
3.3.1 Assembly preparation at the measuring point
This Section describes the welding work on the duct including making fixing elements
onsite.
Fig. 6: Fitting recommendation for the mounting flange (duct diameter not representative)
3.3.2 Uncovering the duct
▸ If necessary, remove approx. 800 x 1500 mm (W x H) of the duct insulation to be able to
access the duct during subsequent work.
▸ Keep the insulation material removed for later refitting resp. provide new suitable
insulation material.
Duct wall (steel)
Duct insulation
Flange with tube,
standard: L = 240 mm
Working platform
1.3 – 1.5 m
Distance to SLV4
min. 700 mm
Markings for fitting position, pointing
in flow direction
Active measuring path
Flange – flange distance:
CAUTION: Protective measures at the measuring point
▸ Always shut down the installation before any work on the duct!
▸ Secure parts to be separated with, for example, wire binding, to prevent
damage by falling objects.
▸ Take appropriate protective measures against hot, explosive gases or toxic
gases that could possibly escape from the duct.
▸ If necessary, seal off the mounting flange with a cover securely until device
assembly (e.g. for overpressure in duct).