EasyManua.ls Logo

SICK GM35

SICK GM35
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
8009441/YN36/V3-0/2015-08| SICKOPERATING INSTRUCTIONS|GM35
Subject to change without notice
PROJECT PLANNING INFORMATION
3.7 Laying connection lines
Fig. 13: Cable routing diagram
maintcalpardiag
GM 35
Evaluation Unit
CO
CO
2
H
2
O
mg/
m
3
236
Ref. conditions
Hum: wet
Measuring
Operation
Service
Warnin
Malfunction
Power supply
(230/115 V AC) 4 m,
3 x 1.5 mm
2
Cable (CAN); 5, 10, 12, 15, 24 m
Evaluation unit
(cast enclosure shown)
CAN bus extension, ready for
connection, 15 m (option)
CAN bus cable
(standard), 4 m
Terminal box (option)
Power supply (230/115 V AC)
3 x 0.75 mm
2
3 binary inputs
6 x 0.5 mm
2
3 analog inputs
6 x 0.5 mm
2
3 binary outputs 6 x 0.5 mm
2
3 analog outputs 6 x 0.5 mm
2
Purge air unit SLV 4
(2 BH 13)
Power supply
4 x 1.5 mm
2
Filter monitor; 5 m
(2 and 3 m extensions possible)
to lengthen the CAN bus connection with
a cable
(1 x 2x 0.5mm
2
, twisted pair, shielded)
provided by the customer
Purge air unit SLV 4
(2 BH 14)
Temperature sensor
PT 1000
Cable connection, standard, included in
scope of delivery
Cable connection, option
Prefabricated with plug-in connector(s)
Onsite wiring
SR-unit with purge air fixture
Reflector with purge air fixture

Table of Contents

Other manuals for SICK GM35

Related product manuals