PROJECT PLANNING INFORMATION
6 Fit the adjustment device (light source, e.g. SR side, adjustment tube on reflector side)
on the flange.
7 Align flange tube 1 so that the light spot from the light source is at the center of the
target on the adjustment tube.
Fig. 11: Aligning the flange with tube using the adjustment device
8 Tack-weld flange 1.
9 Reposition the adjustment device (e.g. light source on reflector side and adjustment
tube on SR side) and align and tack-weld flange tube 2.
10 Weld flange tubes on.
11 Weld on with junction plates as reinforcement when possible;
see “Reinforcing with junc-
tion plates”, page 21.
12 Brick/concrete ducts: Anchor the holding plate with the welded flange with tube to the
duct as shown in Fig. 9:, page 22.
Note During welding and alignment work, make sure the planned flange-to-flange measuring
path is observed exactly when a zero path has already been ordered or delivered.
Otherwise the zero path must be adapted, see
“Preparing a zero path”, page 72.