167 / 244 
Siemens  Standard application AHU  CE1P3977en_02 
Building Technologies  Configuration  01.02.2010 
15.3  Configuration I/Os 
15.3.1  Start page 
 
In Configuration I/Os, the required I/Os, previously set in Configuration 1 and Con-
figuration 2 by the selected functions, are assigned to hardware. 
Moreover, the parameterization of the required conversion for the sensors takes 
place here (e.g. Ni1000; Pt1000; 0-10 V = 0-1000 Pa). 
•  Basis controller: All single-digit positions, e.g. X1. 
•  Extension module 1: All positions X1x, DI1x, DO1x, AO1x, e.g. X11, DO14. 
•  Extension module 2: All positions X1x, DI1x, DO1x, AO1x, i.e., for example, 
X11, DO14. 
 
The I/Os on the extension modules are available, if the module was enabled in 
Configuration 1. 
Configuration 1 and Configuration 2 completed with one reset each. 
As required: 
Start page > Password Enter 
then: 
Main Index > Configuration > Configuration IO’s 
Parameter  Range  Function 
Temperatures    Go to hardware configuration page for all temperature sensors. 
Pressures / flows    Go to hardware configuration page for all pressure and flow sensors. 
Humidity    Go to hardware configuration page for all humidity sensors. 
Digital inputs    Go to hardware configuration page for all digital inputs without alarm 
function. 
Digital alarms    Go to hardware configuration page for all digital inputs with alarm 
function. 
Other    Go to hardware configuration page for air quality sensor and the ex-
ternal setpoint adjuster. 
Outputs damper    Go to hardware configuration page for supply, exhaust air and fire 
dampers. 
Output fans    Go to hardware configuration page for fans. 
Outputs tmp control    Go to hardware configuration page for heating, cooling heat recovery, 
etc. 
Outputs humidifier    Go to hardware configuration page for the humidifier. 
Outputs auxiliary    Go to hardware configuration page for auxiliary functions. 
Outputs alarm    Go to hardware configuration page for both alarm outputs. 
Configuration IOs    This parameters enable the plant after successful parameterization. 
Enable occurs when Configuration 1, Configuration 2 and Configura-
tion I/Os are completed, i.e. when each has the value "done". 
  NotDone  Plant locked against switching on. 
  Done  The plant is unlocked after complete parameterization, i.e. it can be 
switched on. 
Reset Required !!  Passive 
Execute 
Reset required after successful parameterization in Configuration 
I/Os. Assumes the appropriate presettings for Configuration I/Os. 
After reset, value automatically goes from execute to passive. 
 
 
Task 
Distribution to basis con-
troller and extension 
modules. 
Note 
Prerequisite 
Start 
Basis Document Siemens Climatix Control System
BDCX.100820.01GB
Page 167