Installation and Commissioning 7
The installation and commissioning may only be made by experienced commission-
ers. They have to be familiar with the commissioning of protection and control sys-
tems, with the management of power systems and with the relevant safety rules and
guidelines.
This chapter tells you how to install and connect the central unit and the bay units of
the distributed busbar and beaker failure protection SIPROTEC 7SS52 V4 in addition
this chapter tells you which tests with secondary values should be made in order to
put the system into operation with primary values.
7.1 Installation and Commissioning 256
7.2 Checking the Connections 261
7.3 Commissioning 262
7.4 Checks With Secondary Values 278
7.5 Checks With Primary Values 287
7.6 Final Check of the Protection 288
www . ElectricalPartManuals . com

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens SIPROTEC 7SS522 V4.6 and is the answer not in the manual?

Siemens SIPROTEC 7SS522 V4.6 Specifications

General IconGeneral
BrandSiemens
ModelSIPROTEC 7SS522 V4.6
CategoryPower distribution unit
LanguageEnglish

Related product manuals