Quality Assurance Daily Quality Measurements
0.0
syngo CT 2007E Emotion Operator Manual
02/2008
0.0
F.2-5
0.0
Triggering radiation
F.2
✓ In the Quality Daily dialog box you are prompted to initiate
radiation.
F.2
F.2
✧ Press the Start key on the control box.
The position of the phantom set is checked and displayed. Then,
the first measurement is started automatically.
F.2
i
.2
F
For incorrect positioning of the phantom set, a message is dis-
played. Correct the position, if necessary.
F.2
For each tube voltage (kV step), two measurements are per-
formed.
F.2