Commissioning SMA Solar Technology AG
36 SWebBox-TEN101232 Technical Description
5. Connect the insulated conductors to the plug
connector. Observe the insulated conductor
configuration on the RS485 communication bus.
6. Shorten the unused insulated conductors down to
the cable sleeve.
7. Place the plug on the bottom half of the cable
enclosure and use the cable tie to fix the cable
jacket to the bottom half of the cable enclosure.