SMA Solar Technology AG Settings
Technical Description SWebBox-TEN101232 57
10.1.3 Setting the Operator Name
1. Select "WebBox > Settings > System" in the user interface.
2. Enter the operator name in the "Operator name" field.
3. Select [Save].
☑ The operator name is set.
10.2 Setting the Communication Type of the PV Plant
1. Select "Plant > Settings" in the user interface.
2. Select the device communication method in the "Interface" field.
3. If SMA-COM is selected, select [Save] and continue with section 10.2.1”Setting SMA-COM”
(page58).
or
If ETHERNET is selected, select [Save] and continue with section 10.2.2”Setting ETHERNET”
(page59).
"SMA-COM" • All Sunny Boy devices
• All Sunny Mini Central devices
• All Sunny Island devices
• All Sunny Backup devices
•Sunny SensorBox
• Sunny Central (US version only)
"ETHERNET" • All Sunny Central devices (US version only)