B58FZS 0000000078 EN 002 100
SERVICING
8.2 Service
⚠ WARNING
Lethal danger and material damage due to lack of service!
Service tasks deferred or carried out incorrectly impair the safety of the front loader.
Only have service carried out by authorised personnel.
Only have visible defects repaired by trained qualified personnel.
Observe additional documentation, e.g. for implements, for other service tasks.
To ensure proper operating condition of the front loader, the defined service tasks must be performed
at the specified intervals by qualified personnel.
Have service tasks performed regularly according to the service intervals described in the
following.
8.2.1 Service schedule
The specified service intervals are guidelines.
Adjust the intervals according to the operating conditions.
Consult with a workshop for any questions.
Maintenance position Job
Interval
[operating hours]
Check the screw connections Check, tighten if necessary (see 11.3 Tightening torque for
screws)
100 h
Bearing positions Lubrication (refer to the lubrication schedule)20h
Front loader mountings (catch
hooks)
Lubrication (refer to the lubrication schedule) 100 h
Check for wear (see 8.2.2 Service instructions for front
loader mountings)
200 h
Front loader locking mechanism Check the setting 20 h
Lubrication (refer to the lubrication schedule) 100 h
Comfort Drive Open and close the shut-off valve 100 h
1
Hydraulic hose lines Visual inspection, if necessary, have them replaced by an
authorized workshop
100 h
Replacement by authorized workshop 4 years
2
1
At least once a month
2
See information under 8.2.5 Service instructions for the hydraulic lines