a
MECHANICAL
CYLINDER BLOCK
(1)
Piston
(2)
Piston pin
(3)
Circlip
(5)
Service hole plug
Tightening torque: N.m (kgf-m,
ft-lb)
(6) Service hole cover
T1:
6.4 (0.65, 4.7)
(7)
O-ring
T2:
69
(7.0,
50.6)
(4)
Gasket
(6)
Turn the cylinder block
so
that
#3
and
#4
cyl-
inders face upward. Using the same procedures
as used for
#1
and
#2
cylinders, install the pis-
tons and piston pins.
15)
Install the water pipe.
16)
Install the baffle plate.
Tightening torque:
6.4 N.m (0.65 kgf-m,
4.7
ff-lb)
17)
Install the oil strainer and O-ring
Tightening torque:
10 N-m (1.0 kgf-m,
7
ff-lb)
18)
Install the oil strainer stay.
19)
Apply fluid packing to matching surfaces
install the oil pan.
Fluid packing:
THREE BOND 1215 or equivalent
S2M
1833A
and
ME( DOHC TURBO)-79