EasyManua.ls Logo

Suzuki DL650K5 - Page 309

Suzuki DL650K5
701 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHASSIS 7-33
Set the punch mark
C on the handlebar clamp forward.
Tighten the handlebar clamp bolts to the specified torque.
! Handlebar clamp bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
NOTE:
When tightening the handlebar clamp bolts, first tighten the bolt
1
and then tighten the bolt
2
.
HANDLEBAR SWITCH BOX
Install the throttle cable case.
Apply SUZUKI SUPER GREASE to the throttle cables and
their holes.
' 99000-25030: SUZUKI SUPER GREASE “A” (USA)
99000-25010: SUZUKI SUPER GREASE “A” (Others)
Align the mating surface
B of the throttle case with the punch
mark
A on the handlebars.
Install the right handlebar switch box to the handlebars by
engaging the stopper
1 with the handlebar’s hole
2.
Install the front brake master cylinder. ("7-67)
Install the handlebars with the punch mark
C aligned with the
mating surface
D of the clutch lever holder.
PartShark.com
877-999-5686

Table of Contents

Related product manuals