097-58001-02 Revision C – August 2005 TimeProvider User’s Guide 75
Chapter 3 Installing the TimeProvider
Installation Check List
Installation Check List
To verify that the installation of the TimeProvider is complete, perform the following
checks and procedures in Table 3-9.
Powering Up the Shelf
There is no power switch on the TimeProvider. When you apply power to the unit, it
enters the warm-up state. See Starting the TimeProvider for the First Time, on page
82, for more information on powering up the shelf.
Working With Cards
This section describes how to install, remove, and handle the cards associated with
the TimeProvider.
Properly Handling Cards
When handling any of the cards, observe the following precautions:
1. Use proper static control precautions when handling cards! Protect the
equipment against ESD (electrostatic discharge) by using a grounded protective
wrist strap and normal equipment grounding.
2. Avoid touching component leads and edge connectors.
3. Avoid placing the card on an ungrounded surface.
4. Avoid allowing the card to come in contact with insulated surfaces.
Table 3-9. Installation Completeness Checklist
Operation/Indication Complete
Verify that all power and ground wires are installed correctly and securely.
Verify that all communications cables are properly installed.
Verify that all input and output cables are properly installed.