EasyManua.ls Logo

tecan Te-Stack 10612253 - Installing the Te-Stack

tecan Te-Stack 10612253
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 - Putting into Operation
Installing the Te-Stack
Te-Stack Operating Manual, 391862, en, V2.3 5 - 1
5 Putting into Operation
Purpose of This
Chapter
This chapter describes how the Te-Stack is installed and gives instructions on
initial operation.
5.1 Installing the Te-Stack
ATTENTION
Damage to the system is possible, if installation has been carried out improperly.
The initial installation of the Te-Stack on the instrument must be carried out by
a Tecan FSE.
If the position of the Te-Stack should be altered, please call a Tecan FSE.
Where to place
the Te-Stack
Take the following considerations into account when deciding on where to place
the Te-Stack:
The placement of the Te-Stack depends on the overall configuration of the
instrument. Therefore, the position of the Te-Stack must be evaluated individually.
Note: If you need support in doing this, please contact your nearest Tecan
representative.

Table of Contents

Related product manuals