EasyManua.ls Logo

Topcon ASC-10 - Page 25

Topcon ASC-10
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2 Implement Setup
9
the ‘Working Area’, which is the region that product is applied
over for that boom.
l Overlap: Measures the width of the overlap between two adjacent
rows.
l Implement Offset: Measures the distance between the hitch point
and the wheels of the implement.
l Implement Wheels Offset: Measures the distance between the
wheels and the working area of the implement.
l Inline Offset: Measures the off-center offset of the implement
relative to the hitch point. Enter a positive number if the implement
is shifted to the right and a negative number if it is shifted to the
left.
l Trailer Offset: Measures the distance between the trailer hitch point
and the trailer wheels.
l Trailer Wheels Offset: Measures the distance between the
implement hitch point and the trailer wheels.

Other manuals for Topcon ASC-10

Related product manuals