EasyManua.ls Logo

Topcon Paver System 5 - Page 62

Topcon Paver System 5
204 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Stringline Setup
Topcon Paver System Five Operator’s Manual
3-8
3. Set the cut/fill lath on the hub and read the cut or fill from
the grade stake next to the hub. Adjust the clip up or down
until the stringline crosses the cut/fill lath at that point
(Figure 3-10).
Figure 3-10. Adjust Clip and Stringline to Desired Cut/Fill
The stringline is now set to 2 feet above finished grade.
4. Repeat step 3 on page 3-8 at each station before starting to
cut (Figure 3-11).
Figure 3-11. Stringline Set at Desired Elevation
CU
T
.
25
CU
T/FILL
L
A
T
H
G
RAD
E
ST
AK
E
.
2
.
1
.
3
0
.
1
.
2
B
L
U
E
=
FILL
R
E
D
=
CU
T
A
c
u
t
o
f
.
25
f
ee
t
2.0' OFFSET
2.0'
2.0%

Table of Contents