Stringline Setup
Topcon Paver System Five Operator’s Manual
3-8
3. Set the cut/fill lath on the hub and read the cut or fill from
the grade stake next to the hub. Adjust the clip up or down
until the stringline crosses the cut/fill lath at that point
(Figure 3-10).
Figure 3-10. Adjust Clip and Stringline to Desired Cut/Fill
The stringline is now set to 2 feet above finished grade.
4. Repeat step 3 on page 3-8 at each station before starting to
cut (Figure 3-11).
Figure 3-11. Stringline Set at Desired Elevation