InstallinganAdjustableFitting
g033773
Figure26
1.Locknut
3.O-ring
2.Back-upwasher
g033774
Figure27
1.Ensurethatallthethreads,thesealingsurfacesoftting,andthecomponent
portarefreeofburrs,nicks,scratches,orunwantedmaterial.
2.Tohelppreventahydraulicleak,replacetheO-ringwhenyouopenthe
connection.
3.LightlylubricatetheO-ringwithcleanhydraulicuid.Ensurethatthethreads
ofthettingarecleanwithnolubricantapplied.
4.Turnbackthelocknutasfaraspossible.Ensurethattheback-upwasheris
notlooseanditispushedupasfaraspossible(Step1inFigure27).
IMPORTANT
Beforeinstallingthettingintotheport,determinethematerialof
whichtheportismade.Installingattingintoanaluminumport
requiresareducedinstallationtorque.
5.Installtheadjustablettingintotheportbyhanduntilthewashercontactsthe
faceoftheport(Step2inFigure27).
6.Iftheadjustablettingneedstoalignwithanothercomponent,rotatethetting
counterclockwiseuntilitisalignedtothedesiredposition(Step3inFigure
27).Donotrotatetheadjustablettingmorethan1turncounterclockwise.
Groundsmaster
®
4300-D
Page4–13
HydraulicSystem:GeneralInformation
16226SLRevC