2
© 2009 TOSHIBA TEC CORPORATION All rights reserved e-STUDIO182/212/242
OUTLINE OF THE MACHINE
2 - 31
(3) Remove the ground wire.
Fig. 2-47
(4) Disconnect the connector.
Fig. 2-48
(5) Install the PFU connector cover.
Fig. 2-49
(6) Take off the rear cover.
P.2-21 "2.5.10 Rear cover"
(7) Disconnect 1 connector (optional damp
heater). Release the harness from the
harness clamp.
Fig. 2-50