Inspection upon receipt
BMTX-SVN01C-EN 7
Inspection upon receipt
Tracer Summit BCUs ship pre-configured from the factory based on the
model number ordered. Refer to Table 3 on page 11. BCUs may include
the following:
Optional BCU operator display
Optional modem
All mounting accessories
The individual components are pre-installed in the BCU and are shipped
in the same package. Contact Trane for further information about the
BCU model number and individual part numbers. Also, see Figure 3 on
page 11.
A Tracer Summit PC Workstation package includes everything to run
Tracer Summit software. The package includes:
Tracer Summit software CD
Daily Operator Tutorial CD
Place separate orders for literature packages and for additional PC Work-
stations, if they are required.
When unpacking, make sure that the documentation is not lost or dis-
carded with the packing material.
Although all items are inspected thoroughly before leaving the factory, it
is important to check them when they arrive at the job site to ensure that
the correct BCU panel was shipped and that no shipping damage
occurred. Use the Shipping Authorization papers to verify that all items
are present.
If the job site inspection reveals damage or material shortage:
1. Make the appropriate notation on the carrier’s delivery receipt.
2. Immediately file a claim with the carrier and specify the extent and
type of damage/shortage found.
3. Notify the appropriate Trane sales office representative.
Storage
Tracer Summit BCU panels are designed for indoor installation only. If
you must store the panel at the job site before installation, make sure it is
stored indoors in a controlled environment. Acceptable storage tempera-
tures range from –50°F to 150°F (–46°C to 66°C), with a relative humidity
from 10% to 90%, noncondensing.
CAUTION
Avoid equipment damage!
Store the BCU cover and logic board off site until most or all building
construction is complete. Failure to do so could damage the BCU cover
and logic board.

Table of Contents

Other manuals for Trane Tracer Summit

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane Tracer Summit and is the answer not in the manual?

Trane Tracer Summit Specifications

General IconGeneral
BrandTrane
ModelTracer Summit
CategoryControl Systems
LanguageEnglish

Related product manuals