3-3-7
Orig
CD373
Chapter 3
MZ Tow Tractor Section 3
C. PUMP INSTALLATION
1. Place pump and reservoir assembly into floor of right side service bin, reservoir end toward
rear of vehicle.
2. Attach hydraulic lines at elbows as labeled from removal.
3. Attach assembly to floor using four (4) mounting bolts. Use long extension rachet and
matching wrenches below tractor.
4. Connect electrical wiring.
5. Top off hydraulic fluid in reservoir.
6. Close right side access panel.