1-4-1
Orig
CD373
Chapter 1
MZ Tow Tractor Section 4
SECTION 4: SHIPPING
A. INTRODUCTION
This section contains instructions for the preparation of shipping the tow tractor from one location to
another. Normally, the shipping of the unit does not involve storage time. If the unit is to be stored
before or after shipment, refer to section 5 of this chapter for details of preparation.
B. PREPARATION FOR SHIPMENT
1. Ensure park brake is engaged. To apply parking brake, lift actuating lever up.
2. Disconnect battery.
3. Secure unit in place using the (2) D-ring locations in the front (Figure 4-1) and either the hitch
or single D-ring (if equipped) on the rear of the unit.
Figure 4-1. MZ Tow Tractor (Front View)
Front D-Ring Locations
C. RECEIVING
Before placing the unit into operation, follow the preoperational guidelines included in Chapter 2,
Section 1, Part B. General Preparations for Use.