DocNo.FM0410issueM‐1Page56
34.KIRK6500DECT
FASTSWITCH CONNECTION
The16PortFastswitchprovides8PoEPorts(PoweroverEthernet)fortheIPBaseStations.
POWER‐connecttotheUPSviathein‐linePSUmodule provided.
PORTS1to8‐connecttotheIPbasestations(upto100metresof4pairCat5ecable).
PORT9‐connecttotheMatrixETHERNETportusingtheRJ45patch leadprovided.
PORT10‐connecttoKirk6500WirelessServerusinganRJ45patchlead.
Note;asecond16PortFastswitch(8xPoE)canbeconnectedtoincreasethenumberofIPbasestationsto16.
ConnectthesecondFastswitchtotheUPSandlinkthe2unitsviaaPatchLeadbetweenPorts11.
Alternativelya24PortFastswitch(24xPoE)isavailable–TynetecPartNo.ZXT559.
MATRIX CONNECTION
TheMatrixIPPBXinterfacestheAdventxttotheDECT;italsogivesaccesstoanoutsidelineandallowszoningofcalls.
24VDC‐connecttotheUPSviathein‐linePSUmoduleprovided.
CO1‐connecttotheAdventxtDECToutputusingtheRJ11/BTleadprovided.
CO2‐connecttoanexternallineusingthesecondRJ11/BTleadprovided.
SLT1‐connecttothefixedCLIdesktelephoneviaaBTmastersocket(Note:cutoneplugofftheRJ11/RJ11leadprovided).
ETHERNET‐connecttotheFastswitchPort9usingtheRJ45patchleadprovided.
‐connecttoasoundEarthterminalusingtheEarthwireprovided
TheMatrixisfactoryprogrammedsoallincominglinesringallextensions.Ifanincominglineistoringspecificextensions
thentheMatrixmustbereconfigured.
Note;intheeventofamainsfailurei.e.iftheUPSbatteriesrunflatorifaUPSisnotfitted,theMatrixconnectsCO1toSLT1
andtheAdventxtwillonlyringthefixedCLIdesktelephone.
KIRK 6500 WIRELESS SERVER PROGRAMMING
TheMatrixmusthaveitsIPaddresssetto192.168.0.2
TheKirk6500WirelessServermusthaveitsIPaddresssetto192.168.0.3
IP12ChannelBaseStationIPaddressesmuststartat192.168.0.4withRadioPartNumbers4andcarryonsequentially.
ADVENT xt PROGRAMMING
ThePBXRingmustbeenabledinthe“GeneralSetup”programming‐seetheAdventxtProgrammingManual(TynetecDoc
No.FM0411).
4 CHANNEL MULTI CELL REPEATERS
Amaximumofthree4ChannelMultiCellRepeaterscanbeconnectedperIPBaseStation.Repeatersrequireapower
connectiononly;theycommunicatewiththeBaseStationvialowpowerradiosignals anddonotrequirealineconnection.
TomaintainDECTcoverageduringamainsfailureallRepeatersmustbeconnectedtoabatterybacked12VDCPSU.See
RepeaterDeploymentRulesonthefollowingpage.
REPEATER POSITIONING
BeforeinstallingpowercablestoRepeaterpositionsitisimportantthattheoptimumpositionforcoverageisestablished.
RegistertheRepeaterontotheIPBase(seeKirkProgrammingKitbelow)thenwiththeRepeaterpoweredfromabattery
walkawayinthedirectionthatcoveristobeextended.Whenthe redLEDontheRepeaterstartstoflashitisoutofrange
andmustbemovedbacktowardstheIPBasebyaminimumof5metresbeforeselectingitsfinallocation.
REPEATER PROGRAMMING
TheKirkProgrammingKit(P/No.ZCS729)isrequiredtoprogramRepeaters ,thekitconsistsofadoubleadapterandcomms
lead–thelatestServiceToolPCsoftwareanduserguidecanbedownloadedfreeofchargefrom;
http://support.polycom.com/PolycomService/support/us/support/voice/dect/dect_base_stations.html