EasyManua.ls Logo

Universal Laser Systems VLS3.75 - Maintenance Schedule

Default Icon
99 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
98
Maintenance Schedule
We recommend the following schedule:
As necessary
• Clean engraving table
• Clean main enclosure
• Clean top door window
Every 8 hours of engraving
• Clean X-Axis and Y-Axis bearings
• Clean X-Axis and Y-Axis rails and bearing
tracks
• Clean X-Axis belt
• Check beam window, #2 mirror, #3 mirror
and focus lens for debris. Clean ONLY if
dirty.
Every month
• Clean cooling fan filters
• Clean Z-Axis lead screws with white lithium
grease
• Check for X-Axis and Y-Axis belt wear.
Replace as necessary.
• Check and/or clean X-Axis and Y-Axis drive
gears
• Check for X-Axis and Y-Axis bearing wear.
Replace as necessary.
• Inspect system for loose screws and
mechanical parts. Tighten if necessary.
Every 6 months
• Clean exhaust plenum
Note: If you have any questions about maintaining the laser system, please contact the ULS Support Team.

Table of Contents