EasyManua.ls Logo

Xovis PC2 - Page 80

Default Icon
99 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
80 / 99 www.xovis.com
Validation Recording
Schedule and manage multisensor validation recordings.
The multisensor view in the “Config” tab allows to setup count lines and zones for the
multisensor:
Likewise when configuring a Single-Sensor, a multisensor allows to draw up to 8 count lines
and zones by using the same drawing method. The drawn multisensor element will be shown
in the section “Scene Elements”.

Table of Contents

Related product manuals