80 / 99 www.xovis.com
Validation Recording
Schedule and manage multisensor validation recordings.
The multisensor view in the “Config” tab allows to setup count lines and zones for the
multisensor:
Likewise when configuring a Single-Sensor, a multisensor allows to draw up to 8 count lines
and zones by using the same drawing method. The drawn multisensor element will be shown
in the section “Scene Elements”.