EasyManua.ls Logo

ABB IRB 4400/60 - Page 271

ABB IRB 4400/60
304 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Select the desired unit and choose Rev Counter Update from the Calib
menu.
The Revolution Counter Update window appears.
xx0100000202
3
Select the desired axis and press Incl to include it (it will be marked
with an x) or press All to select all axes.
4
Press OK when all axes that are to be updated are marked with an x.
CANCEL returns to the Calibration window.
5
Press OK again to confirm and start the update.
CANCEL returns to the Revolution Counter Update window.
6
Not required.At this point, it is recommended that the revolution counter values are
saved to a diskette.
7
CAUTION
If a revolution counter is incorrectly updated, it will cause incorrect
manipulator positioning, which in turn may cause damage or injury!
Check the synchronization position very carefully after each update.
8
How to perform the check is detailed in section Checking the synchron-
ization position on page 274.
Continues on next page
Product manual - IRB 4400 271
3HAC022032-001 Revision: Q
© Copyright 2004-2018 ABB. All rights reserved.
5 Calibration
5.5 Updating revolution counters
Continued

Table of Contents

Related product manuals