EasyManua.ls Logo

ABB IRB1410 - 2: Installation and Commissioning; Transporting and Unpacking

ABB IRB1410
166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 Installation and commissioning
2.0.1 Transporting and Unpacking
3HAC026320-001 Revision: A 35
2: Installation and commissioning
2.0.1 Transporting and Unpacking
NB!
Before starting to unpack and install the robot, read the safety regulations and
other instructions very carefully. See Safety on page 11.
The installation shall be made by qualified installation personnel and should
conform to all national and local codes.
When you have unpacked the robot, check that it has not been damaged during
transport or while unpacking.
Operating
conditions
Storage
conditions
If the equipment is not going to be installed straight away, it must be stored in a dry area at
an ambient temperature between -25°C and +55°C.
When air transport is used, the robot must be located in a pressure-equalized area.
Weight
The net weight of the manipulator is approximately: 225 kg
Parameter Value
Ambient temperature +5º to +45º
Relative humidity Max. 95% at constant temperature

Table of Contents

Related product manuals