EasyManuals Logo

Agilent Technologies 1290 Infinity II User Manual

Agilent Technologies 1290 Infinity II
291 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #39 background imageLoading...
Page #39 background image
1290 Infinity II High-Speed Pumps User Manual 39
3Using the Pump
Best Practices
Power up / Shut-down the pump
Prepare the Pump
Use fresh or different mobile phase (as required).
Purge each channel with 2.5–3mL/min for 5 min. Open the manual purge
valve or use the purge command, depending on the pump type.
Shut Down the System
Flush the column with the appropriate solvents and store it according to
column manual instructions (be sure that the flushing solvent is compatible
with the solvent present in the system to avoid precipitation).
Install a union or a restriction capillary and flush the system extensively with
water, especially after using buffers. For details, see “Flushing Procedure” on
page 48.
Flush and store the system in 50 % methanol or 50 % isopropanol in water,
without additives.
Remove all samples from the autosampler and store them according to good
laboratory practices.
Power off all modules.

Table of Contents

Other manuals for Agilent Technologies 1290 Infinity II

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 1290 Infinity II and is the answer not in the manual?

Agilent Technologies 1290 Infinity II Specifications

General IconGeneral
BrandAgilent Technologies
Model1290 Infinity II
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals