Maintaining Your GC 143
9 Maintaining the PTV Inlet
Consumables and Parts for the Programmable Temperature Vaporization Inlet 144
Exploded Parts View of the PTV Inlet 146
To Install a Capillary Column with the Programmable Temperature Vaporization Inlet 147
To Clean the Septumless Head on the PTV Inlet 150
To Replace the Septumless Head PTFE Ferrule on the PTV Inlet 152
To Change the Septum on the PTV Inlet 154
To Clean the Septum Seat in the Septum Head Assembly of the PTV Inlet 155
To Change the Liner on the PTV Inlet 156
To Replace the Inlet Adapter for the PTV Inlet 158
To Replace the Filter in the Split Vent Trap for the PTV Inlet 160
To Bakeout Contaminants from the PTV Inlet 162