Agilent Technologies Helium Leak Detector
DRAFT 12/11/17
33
Figure 1-12 Mobile Unit Oil Fill
Powering Up
1. Ensure that the roughing pump is switched on and if applicable (IDP-15), set to the
correct voltage setting.
2. Switch the leak detector on, cover the leak detector inlet with a blank-off cap (provided
and already in place), and wait for the screen to read System Ready before operating.