10
Installing the S8700 Multi-Connect
Contents
October 2002
• Installation Space Requirements 159
Sneak Fuse Panels and Emergency Transfer Units 159
110-Type Hardware 159
Cable Slack Manager 159
• Station Wiring Design 160
Information Outlets 160
Station Cables 160
Closets 161
Site Locations 161
Satellite Locations 162
• Station Circuit Distribution from Equipment Room 165
4-Pair Station Circuits 165
3-Pair to 4-Pair Station Circuit Distribution 165
• Voice and Data Terminals 170
• Administration Terminals 172
• Layout 173
Information Outlet Locations 173
Site, Satellite, and Adapter Locations 173
Sizing 4-Pair Station Cables 173
Sizing 25-Pair and Multiple 25-Pair Station Cables 173
3-Pair Station Cable Circuits 174
4-Pair Station Cable Circuits 174
• Patch Cord/Jumper Installation and Administration 175
Label Expansion Control Carrier Cable 177
Connect Expansion Control Carrier Outputs Cable 177
Connect Trunk Pairs Using Concentrator Cables 178
Connect Trunk Pairs to Media Gateway Using
Jumper Wires To Establish 3-Pair Modularity 179
Install Cables Between Media Gateway and MDF 181
Install Connector Cables Between Auxiliary Cabinet and MDF 181
Mount 110A- or 110P-type terminal blocks on the wall 183
Mount 110P-type terminal blocks on a frame 185
Install Cable Slack Managers 187
Install Sneak Fuse Panels 188
Install Coupled Bonding Conductor 191
• Connect the Hardware 193