9
Installing the S8700 Multi-Connect
Contents
October 2002
Install Front Ground Plates (Media Gateways with
Radiation Shielding and Earthquake Protection) 124
Install Media Gateway Clips (Media Gateways
without Earthquake Protection) 126
Connect S8700 Multi-Connect configuration Cables 127
Install the Stratum 3 clock 129
Unpack and Inspect Stratum 3 Clock Cabinet 129
Install and Position Stratum 3 Clock Cabinet 129
Connect AC Power to Stratum 3 Clock Cabinet 129
Check and Connect Commercial AC Power 130
Connect DC Power and Ground to Stratum 3 Clock Cabinet 130
Connect Clock Cabinet Grounding 131
Connect Stratum 3 Clock DC Power 131
Set the Clock Options 131
Cable the Stratum 3 Clock 133
Install the Stratum 3 Clock Wiring 135
Installing the Avaya G700 Media Gateway 139
Cabling Media Gateways 141
Information about Installing the Cabling 141
Installing the Telecommunications Cabling 142
Provisioning Plan 143
Main Distribution Frame (MDF) Hardware 144
MDF Cross-Connect Fields 147
Main Distribution Frame 148
Main Distribution Frame Labels 150
Off-Premises Circuit Protection 151
Sneak Fuse Panels 152
Cable Installation 153
Equipment Room Cabling Labels 153
Cable Routing Guidelines 154
Control Carrier Outputs Cable Installation 154
Trunk Cables Among Network Interface,
Sneak Fuse Panel, and Media Gateway 155
Coupled Bonding Conductor 158

Table of Contents