EasyManua.ls Logo

Binder vdl 23 - Pump Module (Option); Figure 16: VDL Mounted on Pump Module; Figure 17: Pump Module, Rear View (Example Size 115)

Binder vdl 23
235 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
VDL (E3) 09/2019 Page 61/234
Sweeping after completion of chamber operation (recommended):
You can stop sweeping 15 minutes after turning off the chamber: Close the pressure regulator to (turn
counterclockwise).
Check on the manometer that there is no longer any overpressure.
Regarding use of the USB connection during chamber operation please observe the instructions
given in chap. 22.1.
6.3 Pump module (option)
The mounting instructions Art. no. 7001-0137 supplied with the pump moduledescribe
how to mount the vacuum drying oven onto the pump module and installing the suction
line into the pump module.
Figure 16: VDL mounted on pump module
(example size 115)
Figure 17: Pump module, rear view
(example size 115)
(11) Connection to extraction
(13) Fixation screw fitting for grounding
(13
(11)

Table of Contents

Other manuals for Binder vdl 23

Related product manuals