166
If the storage period is longer than 3 months, additional protective measures
must be taken:
− Clean the BMS alpha
CR
with a high-pressure cleaner and then
preserve the machine.
− Remove any additional heavy oil encrustations inside the machine with
a cold or lime cleaner.
− Maintain the motor as described in the enclosed manual of the
manufacturer.
− Jack up the machine during longer standstills to relieve the tyres and
prevent deformation.
− Grease all moving parts on the chassis and spray the machine with
preservative.