Commissioning
7.6
93
7.6 Commissioning
WARNING
Risk of injury from moving components.
Movable parts can cause severest injuries during operation.
Do not stay in or close to danger zones.
Never reach into running devices.
In particular, never open the dome screen during operation.
Never take the safety switch, which protects against opening the dome
sieve during operation, out of operation.
Only carry out work when the dome screen is closed.
Checks before commissioning
The following basic checks must be carried out before each commissioning:
Is the machine installed correctly.
Is the machine secured against rolling away.
Does the ground have sufficient bearing capacity.
Are all safety and protective devices fitted and functional.
Is the machine technically in order.
Are all cables and connections connected and secured.
Are all machine closures closed (tank, oil, cooler, battery, filter, etc.).
Are all lubrication points greased sufficiently.
Is the central lubrication functioning properly.
Are the delivery hoses, couplings and seals in perfect condition.
Is the discharge stand mounted correctly.
Do delivery hoses and couplings match each other.
Are securing devices (hose holders, suspension eyes) for the laid
delivery hoses are in place. Are the delivery hoses and delivery hose
connections adequately secured.
Have the delivery hoses been laid correctly (see Section 7.4).