EasyManuals Logo

COBHAM SAILOR 60 GX-R2 4.5 W User Manual

COBHAM SAILOR 60 GX-R2 4.5 W
192 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #54 background imageLoading...
Page #54 background image
98-148248-C 5-1
Chapter 5
5555
Power and start up
Power and start up 5
This chapter has the following section:
Power-up procedure
5.1 Power-up procedure
1. Connect power to the ACU.
2. Switch on the ACU. The unit starts up and goes through an initialization procedure:
•ACU POST
ADU Initializing
•ADU POST
•READY
This may take some time (up to a couple of minutes).
3. The SAILOR 600 VSAT Ka is ready to be calibrated (for first time power up) or receive
data from the modem (when in normal operation).
The LEDs Power and Fail/Pass are steady green, the LED Logon is off. For further
information on status indicators see Status signalling with LEDs and status messages
on page 8-13.
Make sure there are no hardware failures or error codes shown in the display of the
ACU. For more information on error codes and events see System messages on
page D-1.
4. Make an azimuth calibration, see Heading input and position system on page 6-4.
Create one or more VSAT modem profiles. See Modem profiles on page 6-22.
5. Create one or more satellite profiles. See Satellite profiles on page 6-21.
6. For more detailed step-by-step instructions, see the chapter Configuration on page 6-1.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the COBHAM SAILOR 60 GX-R2 4.5 W and is the answer not in the manual?

COBHAM SAILOR 60 GX-R2 4.5 W Specifications

General IconGeneral
BrandCOBHAM
ModelSAILOR 60 GX-R2 4.5 W
CategoryAntenna
LanguageEnglish

Related product manuals