EasyManuals Logo

COBHAM SAILOR 60 GX-R2 4.5 W User Manual

COBHAM SAILOR 60 GX-R2 4.5 W
192 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #55 background imageLoading...
Page #55 background image
Power-up procedure
5-2 Chapter 5: Power and start up 98-148248-C
5.1.1 Initialisation steps in daily use
Once the system is configured and a satellite profile is active, the startup sequence is as
follows:
•ACU POST
Antenna initializing
Antenna SW upload (If the software versions in the ADU and ACU are not the same,
a software update is done during startup.)
Antenna POST
•READY
POINTING ANTENNA
•ACQUIRING SIGNAL
•TRACKING
5.1.2 SAILOR 600 VSAT Ka operational
When the display shows TRACKING. MDM: NETOK and the LED Logon is steady green
the system is operational.
Figure 5-1: ACU: LEDs, display and keypad (detailed, example)
Main NAV:GH MDM: NETOK LAN: 1 – 3 4
TRACKING
6$7:5;/+7;0$5

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the COBHAM SAILOR 60 GX-R2 4.5 W and is the answer not in the manual?

COBHAM SAILOR 60 GX-R2 4.5 W Specifications

General IconGeneral
BrandCOBHAM
ModelSAILOR 60 GX-R2 4.5 W
CategoryAntenna
LanguageEnglish

Related product manuals