Chapter 6.0 Maintenance
6.1 Preventative Maintenance Tasks
Table6-1PreventativeMaintenanceTasksidentifiestasksthatshouldbeperformedonaregularbasistomaintain
optimalperformanceofthesystem.
Table 6-1 Preventative Maintenance Tasks
Item Task
Frequency
6 Months 12 Months Other
General
Inspections
Checkphysicalconditionofcompressor.
P
Checkforexcessivevibrationfromotherrotatingequipment.
P
Checkforoilinthesystem.Thecompressormustoperateinan
oil-freeenvironment.Ensurealloilisremovedfromthesystem.
P
Compressor
Inspections
ConnecttothecompressorusingtheServiceMonitoringTools
softwareanddownloadfaultandeventlogs.Reviewandsave
logsforfuturereference.
P
ConnecttothecompressorusingtheServiceMonitoringTools
softwareandperformacalibration.Donotsavethecalibrationto
EEPROMifthecompressorhasbeenoperatingcorrectly.Create
andsaveaCalibrationReportforfuturereference.
P
InspecttheCapacitorReliefMembrane.Replaceasnecessary.
P
Electrical
Inspections
Checkmainpowersupplyvoltages.
P
Ensureelectricalterminalsaretight.
P
Checkforsignsofhotspots/discolorationonpowercables.
P
Checkamperagesduringoperationareasperdesign.
P
CheckDCbusvoltage.
P
ReplaceDCCapacitorBusBarAssembly.(RefertoSection4.21DC
CapacitorBusBarAssemblyonpage165)
Energized:10
years/Denergized:5
years
Checkoperationofallsystemsafetydevicesandinterlocks.
P
Performmoisture-preventionmeasures.
P
ReplaceSoftStartfan.(RefertoSection4.14.8SoftStartFan
RemovalandInstallationonpage123)
5years,referto
CustomerNotification
B-CN-041-EN
Electronic
Inspections
Ensureallcommunicationcablesaresecure.
P
Ensureallelectronicmodulesaresecure.
P
CheckphysicalconditionofallexposedPCBs.
P
CheckallexposedPCBsfordustbuild-upandcleanifnecessary.
P
Checkdischargeandsuctionpressure/temperaturesensorsfor
accuracyagainstcalibratedpressure/temperaturegauges.
P
Refrigeration CheckoperationofIGVassembly.
P
Checksystemrefrigerantcharge.
P
Checksuperheat/levelcontrol,ifapplicable.
P
Checksystemandliquidlinetoensuresufficientsub-cooled
refrigerantisavailableatliquidlineadapter.
P
Verifydischargecheckvalveoperation.
Ifthereisbackwardgasflowimmediatelyafterstoppingthe
compressor,replacethecheckvalve.
P