EasyManua.ls Logo

Danfoss VLT AQUA Drive FC 202

Danfoss VLT AQUA Drive FC 202
294 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23-11 Maintenance Action
Array [20]
Option: Function:
Select the action to be associated with
the preventive maintenance event.
[1] * Lubricate
[2] Clean
[3] Replace
[4] Inspect/Check
[5] Overhaul
[6] Renew
[7] Check
[20] Maintenance Text 0
[21] Maintenance Text 1
[22] Maintenance Text 2
[23] Maintenance Text 3
[24] Maintenance Text 4
[25] Maintenance Text 5
[28] Clear logs
23-12 Maintenance Time Base
Array [20]
Option: Function:
Select the time base to be associated with the
preventive maintenance event.
[0]
*
Disabled Disables the preventive maintenance event.
[1] Running
Hours
The number of hours the motor has run.
Running hours are not reset at power-on.
Specify the maintenance time interval in
parameter 23-13 Maintenance Time Interval.
[2] Operating
Hours
The number of hours the frequency converter
has run. Operating hours are not reset at
power-on. Specify the maintenance time
interval in parameter 23-13 Maintenance Time
Interval.
[3] Date &
Time
Uses the internal clock. Specify the date and
time of the next maintenance occurrence in
parameter 23-14 Maintenance Date and Time.
23-13 Maintenance Time Interval
Array [20]
Range: Function:
1
h*
[1 -
2147483647
h]
Set the interval associated with the current
preventive maintenance event. This
parameter is only used if [1] Running Hours or
[2] Operating Hours is selected in
parameter 23-12 Maintenance Time Base. The
timer is reset from parameter 23-15 Reset
Maintenance Word.
23-13 Maintenance Time Interval
Array [20]
Range: Function:
Example
A preventive maintenance event is set up
Monday at 8:00. Parameter 23-12 Maintenance
Time Base is [2] Operating hours and
parameter 23-13 Maintenance Time Interval is 7
x 24 hours=168 hours. Next maintenance
event is indicated the following Monday at
8:00. If this maintenance event is not reset
until Tuesday at 9:00, the next occurrence is
the following Tuesday at 9:00.
23-14 Maintenance Date and Time
Array [20]
Range: Function:
Size
related*
[ 0 -
0 ]
Set the date and time for next maintenance
occurrence if the preventive maintenance
event is based on date/time. Date format
depends on the setting in
parameter 0-71 Date Format while the time
format depends on the setting in
parameter 0-72 Time Format.
NOTICE
The frequency converter has no back-
up of the clock function. The set date/
time is reset to default (2000-01-01
00:00) after a power-down. In
parameter 0-79 Clock Fault, it is possible
to program a warning if the clock has
not been set properly, for example after
a power-down.
Set the time at least 1 hour later than
actual time.
NOTICE
When mounting a VLT
®
Analog I/O
option MCB 109 option card, a battery
back-up of the date and time is
included.
Parameter Description Programming Guide
MG20OB02 Danfoss A/S © 05/2018 All rights reserved. 195
3 3

Table of Contents

Other manuals for Danfoss VLT AQUA Drive FC 202

Related product manuals