EasyManua.ls Logo

DOD Technologies ChemLogic CL96 - 2.1.10 Tubing Connections; 2.2 Maintenance Area

Default Icon
91 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DC-TEC-MAN-CL96_B
DODtec.com
REV 1/9/2024 815-788-5200
Page 11 solutions@dodtec.com
ChemLogic® CL96 Operating Manual
2.1.9 Take-up Reel
Empty take-up reels are inserted at the time of ChemLogic tape installation (see section 6.3). During
installation, the previous take-up reel which is full is removed from CL96 and discarded. The previous
ChemLogic tape reel which is now empty should then be used as the next take-up reel.
2.1.10 Tubing Connections
Sample tubing and exhaust use a quick connection system for simple installation. The sampling connections
are made on the top of the CL96 while the exhaust tubing connects on the right side. See section 3.3 for
information on connecting the sample and exhaust tubing. See also Appendix C for important information on
transport times for gas from sampling point to the CL96.
2.2 Maintenance Area
The maintenance area allows easy access for changing ChemLogic tape in the CL96. Figure 2.2 shows the
internal layout with the access panel open. See section 3.5 for tape installation.
Figure 2.2
IMPORTANT : End-of-the-Line filters or In-Line filters are required at all times on each channel.
See section 6.2

Table of Contents