22
Instruction Manual IM01500001E
Effective July 2011
Pow-R-Line switchboards
EATON CORPORATION www.eaton.com
Table 4. Switchboard Inspection Log
Date Checklist 3 Notes and Actions Taken
Cleaning
Bus and cable connections
Insulation inspection
Overcurrent device inspection
Meters
Controllers
Surge protective devices
Other protective devices
Secondary/control wiring
Clean ventilation
Date Checklist 3 Notes and Actions Taken
Cleaning
Bus and cable connections
Insulation inspection
Overcurrent device inspection
Meters
Controllers
Surge protective devices
Other protective devices
Secondary/control wiring
Clean ventilation
Date Checklist 3 Notes and Actions Taken
Cleaning
Bus and cable connections
Insulation inspection
Overcurrent device inspection
Meters
Controllers
Surge protective devices
Other protective devices
Secondary/control wiring
Clean ventilation
ote:N Refer to Maintenance section on page 16.