Page #204 background image
193
© 2017 Eaton. All rights reserved
2018.12.12
Low Capacity Inertia Brake (LCIB) Removal and Installation | Service Procedures TRSM0940
LCIB Removal
Note: The Transmission, Cross Shaft, Release Yoke and
ECA must be removed prior to removing the LCIB.
1. Remove
the 2 mounting nuts with a breaker bar and
socket.
2. Remove th
e LCIB by hand by sliding off of the splined
Input Shaft.
LCIB Installation
1. Slide the LCIB onto the splined Input Shaft while cen-
tering the holes onto the retaining studs.
2. In
stall the 2 retaining nuts and torque nuts to 140–150
lb-ft (190–203 N•m).
Note: The LCI
B can only be installed one way. The label
is toward the right side of the vehicle and facing the fly-
wheel.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Eaton UltraShift PLUS Series and is the answer not in the manual?

Eaton UltraShift PLUS Series Specifications

General IconGeneral
BrandEaton
ModelUltraShift PLUS Series
CategoryMicrophone system
LanguageEnglish

Related product manuals