EasyManua.ls Logo

Ecotech Serinus 44 - Page 115

Ecotech Serinus 44
174 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service
Page 115
Monthly
Perform precision check (pre-check) prior to
commencing any service tasks or making any changes
to the system as found in its current state. This task is
necessary to validate any previously captured data.
5.5
Check particulate filter, replace if full/dirty
6.3.1
Perform a pressure check
6.3.9
Check sample inlet system for moisture or foreign
materials. Clean if necessary
Check fan filter and clean if necessary
6.3.2
Check event log
3.4.1
Check date and time is correct
3.4.8
Check instrument status light
3.3.1
External vacuum pump check (vacuum source)
Cell Pressure of 50 to 200 torr is a good vacuum
leak check
6.3.5
Perform NO
X
span calibration
5.4
Perform precision check (post-check) once all service
tasks have been completed. This task is necessary to
establish a valid start point to begin capturing new
data.
5.5
3 Monthly
Single point NO
2
converter efficiency check
5.7.1
Single point NH
3
converter efficiency check
5.8.1
6 Monthly
Replace the PMT Desiccant Packs
6.3.6
Perform multipoint precision check
5.6
Calibrate analog outputs (only if used)
Yearly
Replace DFU filter
6.3.3
Replace sintered filter and orifice (only if necessary)
Clean reaction cell
6.3.7
Replace NH
3
Scrubbers
6.3.4
Multipoint NO
2
to NO converter efficiency adjust
5.7.2
Multipoint NH
3
converter efficiency adjust
5.8.2
* Suggested intervals for maintenance procedure are a guide only and may vary with sampling intensity and/or
environmental conditions. Please refer to your local regulatory standard for your personalised maintenance
schedule.

Table of Contents

Related product manuals