Maintenance 9. Troubleshooting
No. Message Remedy Note 1 Note 2
10000 Command aborted by user
10002 Bad point file line syntax
10003 Project could not be built.
10004 Cannot initialize Spel class instance.
Cannot initialize parser.
Cannot initialize wbproxy.
10007 Project does not exist.
Check whther the project name and
the path are correct.
Check whether the project name
and the path are correct.
Check whether the project name
and the path are correct.
Cannot execute LoadPoints with Robot
Manager open.
Close the robot manager and
10014
Project cannot be locked. It is being used
Terminate other applications.
Project could not be synchronized.
Check whether the drive
designation is correct.
10018
Invalid IP mask
Check the IP mask.
10019
Invalid IP gateway
Check the IP gateway.
IP address or gateway cannot be the subnet
address.
10021
IP address or gateway cannot be the
Commands cannot be executed because
the project build is not complete.
Execute after the project build is
completed.
Command already in cycle.
10102 Invalid server instance. Specify the correct instance.
Invalid CommandTask value.
Specify the correct task number.
Cannot change ServerInstance after
initialized.
Set ServerInstance before
initialization.
10501 Connection aborted.
10502 Cannot connect with the controller.
Controller firmware is not compatible with
this version of RC+.
USB connection of this system is reserved
for the RC620 Controller and cannot be
used for RC+7.0.
Install the RC+7.0 to another
10505 The specified connection does not exist. Check the connection number.
10600 Frame grabber driver not installed. Install the driver.
RC90 (EPSON RC+ 7.0) Rev.4
196