7 • Maintenance and servicing
62 / 84
80116-938_V24392
2023-03
3. Unplug cable.
4. Repeat test steps 1 to 3 with each MF and MF-U socket.
5. Terminate the test program with <Close>.
6. Stay in the test program list for the next test step.
Plugging detection
Test sockets
The following sockets are tested:
• MF-U
• BI
• MO
Testing and measuring equipment
Erbe Art. No. Description for
20192-127 Patient cable AE MO socket
20192-110 Patient cable AE, international MO socket
MF-U socket
20196-053 Bipolar cable, international
2Pin
22
BI socket
MF-U socket
20196-055 Bipolar cable, international
2Pin
28
BI socket
MF-U socket