Preventive Maintenance
Fox Maintenance © Essemtec AG 4-11
0000074/05
/ March 31, 2017
Pusher needles
To prevent nozzle damages, use genuine
Essemtec pusher needles (SP26/BN01).
Time needed
Schedule around 31 minutes for this task (preparation time of 3 minutes included).
Do not forget to include the time consuption for the daily maintenance which is due at the same
time.
4.4.2 Prerequisites
For a safe and efficient maintenance, detailed in this chapter, the following prerequisites have to
be fulfilled:
Production:
stopped
Machine loading:
Production Material unloaded
Feeders on front side removed
Nozzles, does not matter
Machine operating condition:
in operation
machine at maintenance position
Main electrical power:
connected
Compressed air:
connected
Machine location:
does not matter
Schedule around 3 minutes to fulfill these prerequisites (see also chapter 'Tools, Material and
Scheduling' for the overall effort).
Note:
To gain the above mentioned prerequisites, follow the steps described in chapter "Gaining
Prerequisites a" on page 4-62.