2018-02-20 4812325559EN 43
Towing
Short distance towing
To tow the machine, use the same points used on the lifting
process.
1. Park the machine on a safe and leveled ground. Shim the
cylinders, if necessary.
2. Install the drawbar (avoid the use of cables and chains).
With the engine on: lift the leveling blade or the
tilting blade, if equipped (refer to “Operation”
chapter) and release the longitudinal
transmission (universal joint) of the front and
rear axle.
If the machine's breakage system is disabled, avoid
towing the machine on slopes when the machine is
at high speed. Always use the drawbar.