B. Glossary
B-7
Festo P.BE-CPX-PNIO-EN en 1407c English
Activation/shift Shift of the operating mode to “Fast S tart-up” is performed
in the control softw are, e.g. Siemens STEP 7: Observe the
following note.
Note
Activation of the additi onal function “Fast Start- up” (FSU).
Observe that the shift to “Fast Start-up” in the control soft-
ware must be made at two configuration levels:
– Basic hardware configuration
CPX terminal characteristics Section 2.6.4, “Set up
Prioritized Start-up (FSU)”
– CPX terminal c onfiguration
Allocate configuration table Section 2.7.1, “Open
station symbol” and “Select bus node” – with additional
function FSU.
Further information about the additional function FSU can
be obtained in the Internet www.profinet.com, e.g. in
the “PROFINET System Description”.