2. Commissioning
2-36
Festo P.BE-CPX-PNIO-E N en 1407c English
Note
The “Fast Start- up” operating mode has restrictions re-
garding commissioning and parameterisation. Detailed
information can be found in the corresponding chapters.
Alsoobservethenotesinsection2.8andsectionB.1.3
regarding “Fast Start-up”.
Activate “Fast Start-up” 8. Place a check in front of “Prio ritized S tartup” 2 in the
window “Properties – CPX” (see Fi g. 2/5).
9. Select the tab “IO Cycle ” (1 in Fig. 2/6).
1
2
3
Fig. 2/6: “Fast-Start-up” settings – adaptation of the I/O cycle time (update time)