Figure 3-10 Backstop......................................................................................................................................35
Figure 3-11 Bearing monitoring using a Pt 100 resistance thermometer: ......................................................39
Figure 3-12 Bearing monitoring using a shock-pulse transducer ...................................................................40
Figure 3-13 Complete acceleration sensor (A) and threaded connector (B) ..................................................41
Figure 3-14 Gear unit with main and auxiliary drive .......................................................................................42
Figure 4-1 Transport symbols.......................................................................................................................47
Figure 4-2 Shear and lateral pulling when using eye bolts...........................................................................48
Figure 4-3 Position of the attachment points, at type S.N ≤ 280 and K.N ≤ 280 gear units .........................48
Figure 4-4 Position of the attachment points, at type S.N ≥ 280 and K.N ≥ 280 gear units .........................48
Figure 4-5 Position of the attachment points at type S..S gear units............................................................49
Figure 4-6 Position of the attachment points at type K..S gear units............................................................49
Figure 4-7 Oil filling locations and oil drain locations for type S.N gear units...............................................50
Figure 4-8 Oil filling locations and oil drain locations for type K.N gear units...............................................50
Figure 5-1 Alignment surface........................................................................................................................56
Figure 5-2 Stone bolt ....................................................................................................................................58
Figure 5-3 Foundation block.........................................................................................................................59
Figure 5-4 Inserted anchor bolt.....................................................................................................................60
Figure 5-5 Tightened anchor bolt..................................................................................................................61
Figure 5-6 Gear unit with a hollow shaft and parallel keyway.......................................................................63
Figure 5-7 Screw spindle for gear units with hollow shaft and parallel keyway............................................65
Figure 5-8 Dismantling using hydraulic pulling equipment ...........................................................................67
Figure 5-9 Preparation for gear units with hollow shaft and shrink disk .......................................................70
Figure 5-10 Possible displacements...............................................................................................................72
Figure 5-11 Alignment process based on the example of a flexible coupling.................................................72
Figure B-1 Rating plate ...............................................................................................................................113
Table of contents
REDUREX Gear unit 5200en
Operating Instructions 03/2019 9